AEA NSTS Test
SPRAY-TRAC SYSTEMS LIMITED
Price not listed
Description We are a testing centre for liquid! The Sustainable Use Directive (SUD) requires that all pesticide application equipment (PAE) is tested on a regular basis* Any machine applying pesticides after 26/11/16 must be tested by the relevant dates. Timescales of test vary depending on type and size of equipment. Boom sprayers over 3 metres wide, air blast sprayers, train and aircraft sprayers (includes Red Tractor Livestock Assurance Schemes) 1. Tested by 26/11/16 OR first test due before the machine is 5 years old 2. Re-test within 5 years up to 2020 3. After 2020 re-test every 3 years
SPRAY-TRAC SYSTEMS LIMITED's own words, read from their page.
Buy from SPRAY-TRAC SYSTEMS LIMITEDPrice seen 2026-09-19. Not an affiliate link, we earn nothing from it.
