R40154 Mk4 Open First BR Coach H 11212 Intercity Swallow
Rails of Sheffield
£39.95
Built at Metro-Cammell's Washwood Heath factory, 314 Mk4 coaches were produced between 1989 and 1992. They were built specifically for use on the newly electrified East Coast Main Line, along with hopes that a second order for the West Coast Main Line would be placed at a later date, although this second order never transpired. Mk4 coaches featured many improvements over the Mk3s such as push-button operated plug-type doors, fully sealed gangways and a designed top speed of 140mph. Much of the Mk4 design was based upon the Advanced Passenger Train. In particular, Mk4 coaches feature sides prof
Rails of Sheffield's own words, read from their page.
Buy from RAILS OF SHEFFIELD LIMITEDOut of stock. Price seen 2026-09-19. Not an affiliate link, we earn nothing from it.












