4P-020-222 GWR Toplight Mainline City Twin City Chocolate & Cream Composite 7906 Set 3
Rails of Sheffield
£44.95
The first order for these coaches was placed in 1915 but, due to the First World War, they were not built until 1920. The second batch was completed in 1921. Six sets of coaches were produced with each set comprising six coaches. The coaches were close coupled and constructed with a steel body rather than the traditional wooden panelling. Due to the restrictive loading gauge of the London Underground tunnels, the carriages are 7 inches lower than other contemporary carriages of the time. This enabled them to travel directly to Aldgate and Liverpool Street, on the Metropolitan Underground syste
Rails of Sheffield's own words, read from their page.
Buy from RAILS OF SHEFFIELD LIMITEDPrice seen 2026-09-19. Not an affiliate link, we earn nothing from it.












