Faster facade drilling on site: Berkeley
Holemaker Technology
Price not listed
Berkeley Groups’ prestigious West End Gate development in Paddington, London required thousands of 12mm holes to be drilled onsite in 12mm thick galvanised steel in order to mount glazing brackets. Cement particle board was being used as a covering over the steel, thus preventing the use of magnetic drills. The construction team had been using cheap twist drill bits in cordless, hand-held drills to make the holes required but... The process had been a time-consuming sequence of drilling -An 8mm pilot hole -Stepping up to a 10mm hole with a new drill bit -Completing the hole at 12mm with a thir