Heart & Industry

Home · Bramley Engineering (Lifting Gear)

Overhead Line and Rail Industry Lever Hoist

Overhead Line and Rail Industry Lever Hoist

Bramley Engineering (Lifting Gear)

Price not listed

William Hackett s SS-L5 lever hoist complies with British Standard BS EN13157:2004 +A1:2009 and Network Rail Certificate of Acceptance PA05/06687. The lever hoist capacity ranges from 800kg to 10 tonnes and the RL5 1.5t capacity serves a dual role. As well as approval for overhead line work by Network Rail, the lever hoist is also designed for use with the “Ironman” rail handling system. For “Ironman” usage the unit is rated to 1.5 tonne and is painted yellow as specified by RIS-1701-PLT. The RL5 IRONMAN lever hoist is appropriate for use within an operating temperature range of -40°C to +55°C

Bramley Engineering (Lifting Gear)'s own words, read from their page.

Buy from BRAMLEY ENGINEERING (LIFTING GEAR) LIMITEDPrice seen 2026-09-26. Not an affiliate link, we earn nothing from it.

Where this comes from

The part other shops don't tell you. Three separate questions, kept separate on purpose, each with its source.